Bringing Low Voltage into the Design Phase, and Off the Punch List

Sean Goldfiner of Acoustic Design Systems explains how builders and integrators can better communicate to introduce low voltage technology earlier in the design process.
Published: October 26, 2026

For most home builders, low voltage technology such as audio, lighting control, networking, security and automation, shows up at the wrong point in the process. It ends up on an option sheet late in construction as an add-on for buyers. When low voltage technology is treated this way, it often leads to lower attachment rates, rushed installs and change orders that would have been better designed out from the start.

The fix is a finding a different point of entry for low voltage discussions. When low voltage is part of the design conversation from the beginning and not resigned to a punch-list, the numbers change and so does the buyer experience.

What happens when technology comes in late…

A late-stage low-voltage decision can create a domino effect and oftentimes lead to headaches and expensive changes later on in the project

  • A buyer wants additional access points, but the network plan wasn’t designed for them
  • A homeowner wants motorized shades, but the power is not where it needs to be
  • A security camera is added after exterior finishes are complete which creates a wiring challenge

These problems come from making the technology decisions after the home has already been designed around something else, not the tech itself.

When low voltage is considered during the design phase, integrators can coordinate infrastructure, wiring pathways, equipment locations and power requirements before those decisions become expensive changes. It creates a more predictable process for the builder and a better end product for the buyer.

And what changes when low voltage work is moved upstream

On a recent 64-home production community, instead of the standard model of buyers seeing technology options near closing, we shifted our timing and brought our team into the design phase alongside the builder’s sales and design staff. This change in timing allowed us to introduce buyers to the technology early and present it as part of the home rather than an accessory. This immediately altered the buyer’s perception of the technology and allowed for a more informed decision.

The result was a higher take rate on technology packages, fewer post-close service calls tied to retrofit work and a smoother path from contract to move-in. None of that came from a flashier product lineup. It came from timing and our process.

This isn’t a one-off, either. Across builder partnerships, we’ve found a few things that can make a huge difference:

  1. Buyers meet the tech team before the option sheet. A conversation with a person who can answer real questions outperforms a printed menu every time.
  2. The experience is physical, not just paper. A model home with working systems sells technology far better than a spec sheet ever will.
  3. The menu is designed in a collaborative setting instead of just seen on a pricing sheet. Clear tiers and bundled options outperform an a la carte list that asks buyers to build their own package from scratch.

Builders who take this approach can turn low voltage into one of their highest-margin option categories. Those who wait until late in the process can miss that revenue opportunity and also create a more complicated installation experience for the buyer.

What builders need to know about an integrator’s work

The timing pressure is real. Buyer expectations for connected homes keep rising and the technology underneath is consolidating. Centralized, PoE-based low voltage systems are becoming the standard build approach rather than the exception and current NEC updates are reshaping how this work gets scoped and licensed. By the time construction is underway, many of the decisions that affect low voltage are already difficult or expensive to change.

If your builder isn’t already asking you these questions, here’s what you need to be telling them on projects:

  • At what point in the process does your team engage – during design, framing or after drywall?
  • Will buyers see a working demonstration or only a price list?
  • How is the option menu structured and who tested it?
  • What’s your actual take-rate data and can you show it?

The takeaway

Low voltage isn’t an amenity to bolt on at the end. It’s a design decision that affects buyer experience, builder margin and install quality. The earlier it enters the process, the better it performs on all three. We have seen firsthand what changes when low voltage becomes part of the design conversation. For builders, bringing the integrator in earlier can mean better-planned infrastructure, fewer installation headaches and a technology package that adds value for both the buyer and the home. It is a win-win for everyone involved.

Sean Goldfinger is the Field Operations Manager at Acoustic Design Systems (ADS), a Las Vegas-based leader in commercial and residential home automation and security solutions. With nearly 60 expert technicians and 30 service vehicles, ADS specializes in providing revolutionary, custom-designed solutions to fit every lifestyle, including integrated room controls, audio and visual entertainment systems, security and monitoring systems, controlled access, acoustic panels, lighting and shade control, thermostat control and much more.

 

Strategy & Planning Series
Strategy & Planning Series
CE Pro BEST Product Awards
Strategy & Planning Series
Strategy & Planning Series